Existing systems

Solar Maintenance and Repair Prospecting

We map the arrays already installed across your service radius — commercial rooftops and residential streets — estimate size and vintage, and note visible condition and storm exposure since install. The first 3 are free.

Free preview: 3 properties, delivered 3 business days after we confirm your territory. No card, no call.

Workers part-way through fitting a photovoltaic array on a low-slope commercial metal roof: one panel stands on edge in the foreground and completed rows run away toward hills on the horizon.
An array already installed, illustrative

Sec. 01 — The decision

The installer who built the array is usually gone, and nobody has a map of what they left behind.

The original EPC has been acquired or exited, inverter warranties expire around year ten, and no register of installed arrays exists — least of all for the residential systems between your commercial sites. So we build one.

See how the research works

Sec. 02 — Evidence

What an existing array tells you from 400 feet up, and what it refuses to

Remote evidence is unusually good at finding arrays and bracketing their age, on a warehouse roof or a residential street, and unusually bad at diagnosing them. Both halves are in the table.

IndicatorWhere it comes fromWhat it settles — and what it does not
Array footprint and module countAerial imagery panel signatures, row spacing and module geometryGives a module count and, with an assumed wattage for the install era, a DC size band good enough to sort a 90 kW roof from a 900 kW one. The interconnection agreement has the real nameplate.
Residential arrays and street densityImagery panel signatures on pitched roofs, residential PV permits, assessor year-built and owner-occupancy fieldsResidential systems detect the same way but sit on pitched, dormered and shaded planes, so misses run higher and confidence is marked per property. Their value is density: a street installed in one era routes as a single visit.
Mounting systemImagery shadow geometry, visible ballast blocks, rail and tilt patternsSeparates ballasted, mechanically attached, flush metal-roof, carport and ground-mount systems, which decides crew, equipment and access cost on a service call. Attachment detail and flashing condition are not visible.
Install vintagePV-scoped permits, state incentive and interconnection registries, first imagery showing the arrayBrackets the install year, which brackets the inverter population and the warranty position. Where no permit was indexed, imagery gives an upper bound only.
Inverter topologyImagery of pad- or wall-mounted equipment, combiner placement, permit descriptionsDistinguishes a visible central or string installation from one with no equipment signature, which usually implies microinverters or optimisers. Manufacturer, model and firmware are not readable.
Visible array conditionRecent aerial imageryFlags soiling, vegetation grown in since install, missing or displaced modules, debris and ponding at the array edge. It cannot see hot spots, diode failures, delamination, string outages or ground faults.
Storm exposure since installNOAA severe weather reports and gridded hail swaths, filtered to dates after installShows whether the array has taken a 1.0 in or 1.75 in hail day, or a high-wind event, since it was built. It does not prove damage, an open claim, or a covered loss.
Who currently services itNot observableThere is no public source for O&M contract status, incumbent provider or renewal date. We say so on every property rather than inferring it.
Scroll the table sideways for all three columns
Detection limits

Arrays installed since the last flight do not appear, and steep-slope, shaded or parapet-hidden systems can be missed. Your report states the imagery date per property and marks ambiguous detections.

Sec. 03 — The engagement

A service territory you can route, priced against arrays that actually exist.

O&M sells on proximity and timing, so the register is ordered by both.

  1. Define the radius and the floorYou give us the drive-time or counties, whether you service commercial, residential or both, and the smallest array worth a truck roll.
  2. Sweep imagery, cross-check recordsWe identify array signatures, then corroborate each against PV permits and interconnection registries where published.
  3. Rank by service opportunityAn analyst orders the territory by size, vintage and condition, and states confidence on ambiguous detections.
Existing-array register

Every array identified, commercial or residential, with address, parcel identifier and the imagery date it was confirmed on.

Size band and module count

Estimated module count and a DC capacity band, with the wattage assumption behind it stated openly.

Mounting and equipment notes

Ballasted, attached, carport or ground-mount, plus visible inverter equipment and what it means for access.

Install vintage evidence

The permit, registry entry or imagery sequence that brackets the install year, with date and jurisdiction cited.

Condition and storm log

Visible condition observations plus severe-weather events recorded at that parcel since the estimated install date.

Owner and site context

Owner of record, apparent occupancy, site access notes, and the qualification questions still outstanding.

Sec. 04 — Limits

Finding an array is remote work. Diagnosing one is not.

This is a prospecting instrument, deliberately not a condition assessment.

Settled by the report

  • Where the arrays in your service radius are, commercial and residential, at parcel and address level
  • Roughly how large each one is, and how they cluster for routing
  • Roughly when each was installed, from permits, registries or imagery sequence
  • What the mounting type implies for crew, equipment and roof access
  • Which severe-weather events the parcel recorded since the array went up

Not settled — inspection or data required

  • Whether the system is underproducing, and by how much
  • Module-level faults: hot spots, cracked cells, diode failures, delamination
  • Inverter make, model, firmware, fault history or remaining warranty
  • Whether hail or wind actually damaged anything, or whether a claim exists
  • Who holds the current O&M contract and when it renews
The five checks that turn a detection into an opportunity
  1. Ask for monitoring access or twelve months of production data and compare it against expected yield.
  2. Request the EPC contract, interconnection agreement and equipment list to confirm nameplate and warranty position.
  3. Establish whether an O&M agreement is in force, who holds it, and when it renews.
  4. Schedule an aerial or on-roof infrared scan before quoting module-level repair work.
  5. Confirm roof warranty implications and site access with the owner before any crew goes up.

Sec. 05 — Questions

What imagery can prove about an existing array, and what it cannot.

Further reading

How this screen is actually run.

The method behind this report, written out in full.

Related solutions

Other property questions we answer with the same workflow.

Solution

Commercial solar prospecting

The roofs with no array yet, commercial and residential, ranked on usable area and tariff regime.

Explore this solution
Solution

Commercial roofing and HVAC prospecting

Same territory, different trade: membrane condition, ponding and rooftop unit counts.

Explore this solution
Solution

Property risk and resilience screening

Rank a portfolio by hail, wind, flood and heat when the question is protection.

Explore this solution

Start with your drive-time

Tell us your service radius and we will find three existing arrays in it.

Give us the drive-time or counties you cover and the smallest array worth a truck roll. We return 3 identified systems with size, vintage and condition notes in 3 business days, free.

Get 3 free properties

3 properties · 3 business days · no card

3 properties, freeNo card · 3 business daysStart free