Industry Analysis

Duke net metering 2027: who to call first

In January 2027 Duke moves older NC solar homes off 1:1 net metering. What changes for those owners, and which homes a service company should call first.

Zander PolkFounder5 min read652 words

In January 2027, Duke Energy moves older North Carolina solar homes off the old 1:1 net metering. Those owners will notice the change on their February bill, and a lot of them will start asking questions.

If you service solar or sell batteries in Duke territory, those questions are your next few months of work. Here is what changes, who it applies to, and how to decide which homes to call first.

What changes in January

Homes that went solar before 2023 have been on legacy net metering. Every kilowatt-hour they sent to the grid was credited at the full retail rate, and credits rolled over until the end of May.

In January those homes move to Duke's Bridge net metering automatically, unless the owner opted into a time-of-use plan by December 1, 2026. Solar used in the same month still offsets their bill as before.

What changes is the surplus. Extra solar left at the end of each month is now credited at Duke's avoided-cost rate, well below retail. A minimum monthly bill and a small monthly charge per kilowatt of system size also apply.

Why owners will call someone

Under 1:1 net metering, a system that underproduced was easy to ignore. Once surplus is worth less, owners start looking harder at their bills, and three questions come up.

  • Is my system producing what it should?
  • Would a battery help me keep more of my own solar?
  • Who services this now that my installer is gone?

Most installers will wait for those calls to come in. The ones who call first, between January and March, get the work.

How many homes this is

In Raleigh alone, the city issued residential solar permits to 1,291 homes from 2010 through 2022, before the new rules began. Raleigh is Duke territory, so nearly all of those homes are on legacy net metering today.

Charlotte, Durham and the towns around them add more on top. That is more homes than one crew can call in a quarter, so the order matters.

Which homes to call first

The billing change is the same for every legacy Duke home, so on its own it ranks none of them above another. It gives you a dated reason to call. What decides who goes first is everything else you can learn about the home.

  • System age. A 2015 install is closer to an inverter replacement than a 2021 one.
  • Hail since install. Radar storm records show which homes sat under a hail path after the panels went up.
  • A closed installer. About 190 Raleigh solar homes were put in by companies that have since shut down, so those owners have no one to call.
  • Trees over the roof. Aerial photos show where shade has grown in since install.
  • Owner and home value. County records show who owns the home and whether they live in it.

None of this proves a system needs work. It tells you which owners are most likely to want a production check or a battery quote when the February bill lands.

Where this comes from

The dates and the billing rules come from Southern Energy Management's guide to the NC Utilities Commission's 2023 net-metering order. Check the current credit rate and minimum bill on Duke's own tariff before you quote a number to a homeowner.

The home counts come from City of Raleigh permit records. The ranking uses county permits, aerial photos, storm history and property records, which is how we build every territory list.

If you service solar or sell batteries in North Carolina, send us your ZIP codes and we will show you three homes there that are worth a call first.

Zander Polk

Founder, Arden Meridian

Zander leads Arden Meridian's product direction and work on explainable property and territory intelligence for commercial solar teams.

View founder profile

Related articles.

Other pieces on the same question.

  • Why route density matters in solar service

    A service opportunity is more valuable when it fits crew coverage, travel time, existing accounts, and a practical field route.

    Industry Analysis2 min read

  • Why solar system age alone is not enough

    Installation age is a useful screening variable, but condition, exposure, design, ownership, service history, and operating context decide what it means.

    Industry Analysis2 min read

  • How to find solar panel repair customers

    Residential O&M screening by street: why route density beats any single job, how to read permit vintage by subdivision, and where remote signals fail.

    Guides7 min read

See this run on your own service area.

Tell us the territory and the decision it serves. We rank 3 properties in it and deliver them 3 business days after we confirm the territory.

Get 3 free properties

3 properties · 3 business days · no card